You can realize here what projects our firm completed in last years. We are convinced that our work and successes give the best evidence of us. That is why we have prepared this list which you can realize about us more in. In addition you can visit a page with certificates confirming our qualification.

For certificates click here.

More information you can find in our Profile or in our Presentation (in Czech).

References

Panelware replacement

Obory: Operator interfaces, panels
Branch: Automotive industry

PANELWARE operator interfaces are used in many plants. These units have become already obsolete and do not suit modern production requirements. We were ordered to replace panelware units with new operator panels without any modification in controlling PLC program. We used new touch QuickPanels and succeeded in installing them without any program modifications.

Realization: December 2005 - July 2009

Power supply and control trolley lines replacement and reconstruction

Fields: Electrical equipment; LJU systems; EMS (Electric Monorail System)
Branch: Automotive industry

It has been many times our company worked with trolley systems or replaced them. We work with both Vahle and Faba system.

Realization: since 2000

Supply of LJU units

Fields: LJU systems; Electrical equipment
Branch: Automotive industry

In 2001 we have become LJU Industrieelektronic GmbH business partner for all the Czech Republic. We supply LJU units as well as units installation, adjustment and service.

Realization: since 2001

Assembling lines of Dobiáš company

Fields: Control system (PLC, SW)
Branch: Concrete industry

This long-term order has begun in 2002 by the complete supplement of control system. We programmed and supplied controlling PLC. We supply technical suppport and prepare program changes demanded by production process changes by now.

Realization: since 2002

Water-proof test customization

Fields: Siemens Control System
Branch: Automotive industry

After changes in water-proof test technology we were ordered to supply software adaptations; we worked with Siemens programmable controllers.

Realization: August 2007

Driving transfers installation at car doors assembly line

Fields: Electrical equipment & control system;
Branch: Automotive industry

Changes have been demanded by a new car Škoda Fabia assembly at car doors assembly line. These changes affected transfers, devices for carriages security. Our company has been ordered to perform a reconstruction of the transfers. New transfers were added to provide fluent passage of the carriages while safety transfers make passage of the carriages safe in the case of failure.

Realization: August 2006

Extension of the EMS line

Fields: Electrical equipment; LJU systems; EMS (Electric Monorail System)
Branch: Automotive industry

Our company accomplished a reconstruction of the assembly line in the Fabia cars assembly hall. We lengthened assembly line and adapted electrical equipment, reprogrammed control software and innovated control parameters of LJU units.

Realization: December 2006

Computer equipment renovation at dispatching centre

Fields: Visualisation system
Branch: Automotive industry

We accomplished renovation of computer equipment at dispatching centre of Fabia assembly hall. We supplied computers with necessary programs we installed on and migrated visualization and database servers.

Realization: December 2006

GLADOL pumping system reconstruction

Fields: Control system (PLC, SW); Visualisation system; Electrical equipment
Branch: Automotive industry

We accomplished electrical distribution box reconstruction and programmed and delivered controlling PLC. We also programmed visualization system to control GLADOL pumping system.

Realization: July - August 2006

Locating equipment at cockpit assembly line

Fields: Electrical equipment
Branch: Automotive industry

Assembly line modernisation demanded new locating equipment isntallation for cockpit assembly line. Our company was ordered to accomplish software and electrical equipment part of the project.

Realization: August 2006

Assembling line for Roomster cars

Fields: Control system (PLC, SW); EMS (Electric Monorail System); Visualisation system
Branch: Automotive industry

The project counted among very large and complex ones. We installed Siemens and B&R programmable controllers, LJU and TURCK appliances. Profibus and CAN buses were used to provide communication as well as special bus working with company protocol LJU and Ethernet.

Realization: November 2005 - April 2006

Light fitting setting up

Fields: Electrical equipment
Branch: Heating industry

We have installed special illuminators without stroboscopic effect at plumber workshop and vehicle bodies packing workroom.

Realization: November 2005 - April 2006

Water management visualization

Fields: Visualisation system
Branch: Automotive industry

Our company supplied Prague heating company with visualization programmed in CIMPLICITY HMI programming environment.

Realization: November 2005 - April 2006

Drive conversion and reconstruction

Fields: LJU systems; EMS (Electric Monorail System); Control system (PLC, SW)
Branch: Automotive industry

We have replaced 75 LJU units in Skoda Auto paintshop in the course of this reconstruction. There was a special demand in the order to accomplish reconstruction without production interruption. We reconstructed and adapted electrical wiring and modificated control software.

Realization: November 2005 - January 2006

Service control for paintshop Škoda Auto a. s.

Fields: Database; Control system (PLC, SW)
Branch: Automotive industry

We programmed and supplied fault monitoring system within service for Skoda Auto paintshop control system. System consists of database server, visualization and other components.

Realization: July - September 2005

Welding line moving and reconstruction

Fields: Electrical equipment & control system
Branch: Automotive industry

We have supplied program for the controller and accomplished electrical equipment in the course of the welding line for Fabia sedan bodies being moved. We programmed controlling unit and accomplished electrical wiring. Although most of our contracts is based on GE Intelligent Platforms PLC we worked with Siemens PLC this time.

Realization: July - August 2005

Car doors assembly line reconstruction

Fields: Electrical equipment & control system
Branch: Automotive industry

Assembly line for car door production and assembling has been extended and we accomplished electrical work supplying LJUs as well as control software modifications.

Realization: July - August 2004

Pressing machine transmigration

Fields: Electrical equipment
Branch: Engineering

We have transmigrated 50 tons pressing machine for our customer.

Realization: June - July 2005

Adjusting of elevator hoists in the assembly room of Škoda A

Fields: Control system (PLC, SW)
Branch: Automotive industry

We have adjusted elevator hoists control by another VersaMax Micro PLC installation and introducing a new LD program. The hoists stop in correct possitions now which was not possible before.

Realization: 2005, February

Lever cutter control reconstruction

Fields: Electrical equipment
Branch: Engineering

We have made a reconstruction of the electrical equipment and machine control, also we have analysed possibilities of hazards and secured the machine against hazards.

Realization: September 2004

Shelf storehouse reconstruction

Fields: Electrical equipment
Branch: Automotive industry

Our company was addressed to solve emergency conditions in shelf storehouse Skoda Auto a. s. We replaced rails, supplied new control GE Intelligent Platforms PLC Series 90-30 and motion cards DSM 314 and upgraded control software. We were able to finish works within several days.

Realization: 1-5 July 2004

Baking furnace for Karsit company

Fields: Control system (PLC, SW); Database
Branch: Automotive industry suppliers

We have programmed and supplied a controlling PLC for the baking furnace for bitumen segments bonding.

Realization: Juny 2004

Concrete handling line in Zdětín

Fields: Electrical equipment & control system
Branch: Concrete industry

We have accomplished reconstruction of the electrical part of the line and programmed and supplied controlling hardware for Zdětín DC (cement co-operative society).

Realization: February - March 2004

Water-proof test in assembly room M13

Fields: Electrical equipment & control system
Branch: Automotive industry

Water-proof test is the last one to proof newly producted cars equality. We took part in its putting into operation for assembly lines, which produce Octavia cars. We have supplied hardware, accomplished electrical equipment and programmed controlling PLC.

Realization: break of 2003/2004

Car axle assembly line

Fields: Control system (PLC, SW)
Branch: Automotive industry

We have provided complete assembly line for axle production controlling in Škoda Auto a. s. We have supplied and installed GE Intelligent Platforms PLC Series 90-30, prepared the LD program and created database.

Realization: break of 2003/2004

Increasing security of the test cylinder work station

Fields: Electrical equipment
Branch: Automotive industry

Experience has brought a need of additional increasing security of test cylinder work station in assembly room M13 Škoda Auto a. s. We have modified circuitry and complemented security relays and signalling.

Realization: December 2003

Sewerage plant in Bělá pod Bezdězem

Fields: Electrical equipment & control system;
Branch: Sewerage plant

We have provided complete electrical equipment, built in the distribution box and control system for the all sewerage plant - both hardware and software part.

Realization: May - June 2003

Seat conveyer reconstruction

Fields: Electrical equipment
Branch: Automotive industry

We have replaced Genius blocks by FieldControl, reconstructed circuitry and built-up and installed new distribution boxes for conveyer controling and regulating.

Realization: December 2002

Galatky painting line

Fields: Control system (PLC, SW)
Branch: Automotive industry suppliers

We have supplied hardware (GE Intelligent Platforms PLC Series 90-30) and control software for line controlling and conveyer speed regulating. They were used for equipping device for replace parts surface adapting in the paintshop of Škoda-Auto a. s.

Realization: August - October 2002

Assembly lines for Škoda Fabia cars

Fields: Control system (PLC, SW); Database
Branch: Automotive industry

This large and challenging project was aimed to built up controlling lines for assembly hall for Škoda Fabia cars in Škoda Auto a. s. Our emploees took part in programming controlling software.

Realization: 1999